Description
After a power system blackout, system restoration is the most important task for the operators. Most power systems rely on an off&ndashline; restoration plan and the experience of operators to select scenarios for the black start path. Using an off&ndashline; designed restoration plan based on past experience may not be the most reliable approach under changing network configurations and loading levels. Hence, an objective restoration path selection procedure, including the option to check constraints, may be more responsive in providing directed guidance to the operators to identify the optimal transmission path to deliver power to other power plants or to pick up load as needed. After the system is subjected to a blackout, parallel restoration is an efficient way to speed up the restoration process. For a large scale power system, this system sectionalizing problem is quite complicated when considering black&ndashstart; constraints, generation/load balance constraints and voltage constraints. This dissertation presents an ordered binary decision diagram (OBDD) &ndashbased; system sectionalizing method, by which the splitting points can be quickly found. The simulation results on the IEEE 39 and 118&ndashbus; system show that the method can successfully split the system into subsystems satisfying black&ndashstart; constraints, generation/load balance constraints and voltage constraints. A power transfer distribution factor (PTDF)&ndashbased; approach will be described in this dissertation to check constraints while restoring the system. Two types of restoration performance indices are utilized considering all possible restoration paths, which are then ranked according to their expected performance characteristics as reflected by the restoration performance index. PTDFs and weighting factors are used to determine the ordered list of restoration paths, which can enable the load to be picked up by lightly loaded lines or relieve stress on heavily loaded lines. A transmission path agent can then be formulated by performing the automatic path selection under different system operating conditions. The proposed restoration strategy is tested on the IEEE&ndash39; bus system and on the Western region of the Entergy system. The testing results reveal that the proposed strategy can be used in real time.
Download count: 3
Details
Title
- Transmission system restoration strategies in real time
Contributors
- Wang, Chong (Author)
- Vittal, Vijay (Thesis advisor)
- Tylavsky, Daniel (Committee member)
- Heydt, Gerald (Committee member)
- Farmer, Richard (Committee member)
- Arizona State University (Publisher)
Date Created
The date the item was original created (prior to any relationship with the ASU Digital Repositories.)
2010
Subjects
Resource Type
Collections this item is in
Note
-
thesisPartial requirement for: Ph.D., Arizona State University, 2010
-
bibliographyIncludes bibliographical references (p. 76-80)
-
Field of study: Electrical engineering
Citation and reuse
Statement of Responsibility
by Chong Wang