Description

The first step in process improvement is to scope the problem, next is measure the current process, but if data is not readily available and cannot be manually collected, then a measurement system must be implemented. General Dynamics Mission Systems

The first step in process improvement is to scope the problem, next is measure the current process, but if data is not readily available and cannot be manually collected, then a measurement system must be implemented. General Dynamics Mission Systems (GDMS) is a lean company that is always seeking to improve. One of their current bottlenecks is the incoming inspection department. This department is responsible for finding defects on parts purchased and is critical to the high reliability product produced by GDMS. To stay competitive and hold their market share, a decision was made to optimize incoming inspection. This proved difficult because no data is being collected. Early steps in many process improvement methodologies, such as Define, Measure, Analyze, Improve and Control (DMAIC), include data collection; however, no measurement system was in place, resulting in no available data for improvement. The solution to this problem was to design and implement a Management Information System (MIS) that will track a variety of data. This will provide the company with data that will be used for analysis and improvement. The first stage of the MIS was developed in Microsoft Excel with Visual Basic for Applications because of the low cost and overall effectiveness of the software. Excel allows update to be made quickly, and allows GDMS to collect data immediately. Stage two would be moving the MIS to a more practicable software, such as Access or MySQL. This thesis is only focuses on stage one of the MIS, and GDMS will proceed with stage two.

Included in this item (2)


Details

Title
  • Optimization of Incoming Inspection
Contributors
Agent
Date Created
2017-05

Machine-readable links