Description
The wood-framing trade has not sufficiently been investigated to understand the work task sequencing and coordination among crew members. A new mental framework for a performing crew was developed and tested through four case studies. This framework ensured similar team performance as the one provided by task micro-scheduling in planning software. It also allowed evaluation of the effect of individual coordination within the crew on the crew's productivity. Using design information, a list of micro-activities/tasks and their predecessors was automatically generated for each piece of lumber in the four wood frames. The task precedence was generated by applying elementary geometrical and technological reasoning to each frame. Then, the duration of each task was determined based on observations from videotaped activities. Primavera's (P6) resource leveling rules were used to calculate the sequencing of tasks and the minimum duration of the whole activity for various crew sizes. The results showed quick convergence towards the minimum production time and allowed to use information from Building Information Models (BIM) to automatically establish the optimal crew sizes for frames. Late Start (LS) leveling priority rule gave the shortest duration in every case. However, the logic of LS tasks rule is too complex to be conveyed to the framing crew. Therefore, the new mental framework of a well performing framer was developed and tested to ensure high coordination. This mental framework, based on five simple rules, can be easily taught to the crew and ensures a crew productivity congruent with the one provided by the LS logic. The case studies indicate that once the worst framer in the crew surpasses the limit of 11% deviation from applying the said five rules, every additional percent of deviation reduces the productivity of the whole crew by about 4%.
Details
Title
- Crew coordination modeling in wood-framing construction
Contributors
- Maghiar, Marcel M (Author)
- Wiezel, Avi (Thesis advisor)
- Mitropoulos, Panagiotis (Committee member)
- Cooke, Nancy J. (Committee member)
- Arizona State University (Publisher)
Date Created
The date the item was original created (prior to any relationship with the ASU Digital Repositories.)
2011
Subjects
- management
- Cognitive Psychology
- Civil Engineering
- Automation
- BIM
- mental model
- micro-scheduling
- Productivity
- resource leveling
- Framing (Building)
- Group decision making
- Cognition
- Building information modeling
- Wooden-frame buildings--Design and construction.
- Wooden-frame buildings
- Construction industry--Management.
- Teams in the workplace--Management.
Resource Type
Collections this item is in
Note
-
thesisPartial requirement for: Ph. D., Arizona State University, 2011
-
bibliographyIncludes bibliographical references (p. 119-123)
-
Field of study: Construction
Citation and reuse
Statement of Responsibility
by Marcel Maghiar