Description
This document contains a feasibility study that explores the necessity, collaborations, and
possible methods of installing a 1 megawatt lithium-ion battery storage facility at San Diego Gas
& Electric’s Century Park campus located in the Kearny Mesa neighborhood in central San
Diego, California.

This document contains a feasibility study that explores the necessity, collaborations, and
possible methods of installing a 1 megawatt lithium-ion battery storage facility at San Diego Gas
& Electric’s Century Park campus located in the Kearny Mesa neighborhood in central San
Diego, California. The battery will serve purposes of adding renewable energy to the energy mix,
reducing operations costs via peak shaving, an educational component for the region, and
meeting stringent State of California and California Public Utilities Commission mandates for
both renewable energy and battery storage capacity.
Reuse Permissions
  • Included in this item (2)


    Details

    Title
    • On-Site Renewable Energy Battery Storage
    Contributors
    Agent
    Date Created
    2020-05-15

    Machine-readable links