Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In an ever-increasing competitive industry landscape, the need to deliver projects within technical, budgetary, and schedule requirements becomes imperative to sustain a healthy return on investment for the project stakeholders. The fact that information lags within the capital projects industry has motivated this research to find practices and solutions that facilitate Instantaneous Project Controls (IPC).
The author hypothesized that there are specific practices that, if properly implemented, can lead to instantaneous controls of capital projects. It is also hypothesized that instantaneous project controls pose benefits to project performance. This research aims to find practices and identify benefits and barriers to achieving a real-time mode of control. To achieve these objectives, several lines of inquiry had to be pursued. A panel of 13 industry professionals and three academics collaborated on this research project. Two surveys were completed to map the current state of project control practices and to identify state-of-the-art or ideal processes. Ten case studies were conducted within and outside of the capital projects industry to identify practices for achieving real-time project controls. Also, statistical analyses were completed on retrospective data for completed capital projects in order to quantify the benefits of IPC. In conclusion, this research presents a framework for implementing IPC across the capital projects industry. The ultimate output from this research is procedures and recommendations that improve project controls processes.
The author hypothesized that there are specific practices that, if properly implemented, can lead to instantaneous controls of capital projects. It is also hypothesized that instantaneous project controls pose benefits to project performance. This research aims to find practices and identify benefits and barriers to achieving a real-time mode of control. To achieve these objectives, several lines of inquiry had to be pursued. A panel of 13 industry professionals and three academics collaborated on this research project. Two surveys were completed to map the current state of project control practices and to identify state-of-the-art or ideal processes. Ten case studies were conducted within and outside of the capital projects industry to identify practices for achieving real-time project controls. Also, statistical analyses were completed on retrospective data for completed capital projects in order to quantify the benefits of IPC. In conclusion, this research presents a framework for implementing IPC across the capital projects industry. The ultimate output from this research is procedures and recommendations that improve project controls processes.
Details
Title
- Instantaneous project controls: current status, state of the art, benefits, and strategies
Contributors
- Abbaszadegan, Amin (Author)
- Grau Torrent, David (Thesis advisor)
- El Asmar, Mounir (Committee member)
- Gibson, Jr., G. Edward (Committee member)
- Arizona State University (Publisher)
Date Created
The date the item was original created (prior to any relationship with the ASU Digital Repositories.)
2016
Subjects
Resource Type
Collections this item is in
Note
- thesisPartial requirement for: Ph.D., Arizona State University, 2016
- bibliographyIncludes bibliographical references (pages 158-168)
- Field of study: Civil and environmental engineering
Citation and reuse
Statement of Responsibility
by Amin Abbaszadegan