Analysis of the state of practice and best practices for alternative project delivery methods in the transportation design and construction industry
Description
Alternative Project Delivery Methods (APDMs), namely Design Build (DB) and Construction Manager at Risk (CMAR), grew out of the need to find a more efficient project delivery approach than the traditional Design Bid Build (DBB) form of delivery. After decades of extensive APDM use, there have been many studies focused on the use of APDMs and project outcomes. Few of these studies have reached a level of statistical significance to make conclusive observations about APDMs. This research effort completes a comprehensive study for use in the horizontal transportation construction market, providing a better basis for decisions on project delivery method selection, improving understanding of best practices for APDM use, and reporting outcomes from the largest collection of APDM project data to date. The study is the result of an online survey of project owners and design teams from 17 states representing 83 projects nationally. Project data collected represents almost six billion US dollars. The study performs an analysis of the transportation APDM market and answers questions dealing with national APDM usage, motivators for APDM selection, the relation of APDM to pre-construction services, and the use of industry best practices. Top motivators for delivery method selection: the project schedule or the urgency of the project, the ability to predict and control cost, and finding the best method to allocate risk, as well as other factors were identified and analyzed. Analysis of project data was used to compare to commonly held assumptions about the project delivery methods, confirming some assumptions and refuting others. Project data showed that APDM projects had the lowest overall cost growth. DB projects had higher schedule growth. CMAR projects had low design schedule growth but high construction schedule growth. DBB showed very little schedule growth and the highest cost growth of the delivery methods studied. Best practices in project delivery were studied: team alignment, front end planning, and risk assessment were identified as practices most critical to project success. The study contributes and improves on existing research on APDM project selection and outcomes and fills many of the gaps in research identified by previous research efforts and industry leaders.
Date Created
2014
Contributors
- Bingham, Evan Dale (Author)
- Gibson Jr., G. Edward (Thesis advisor)
- El Asmar, Mounir (Thesis advisor)
- Bearup, Wylie (Committee member)
- Arizona State University (Publisher)
Topical Subject
Resource Type
Extent
xv, 230 p. : col. ill, col. map
Language
eng
Copyright Statement
In Copyright
Primary Member of
Peer-reviewed
No
Open Access
No
Handle
https://hdl.handle.net/2286/R.I.27405
Statement of Responsibility
by Evan Dale Bingham
Description Source
Viewed on February 12, 2015
Level of coding
full
Note
thesis
Partial requirement for: Ph.D., Arizona State University, 2014
bibliography
Includes bibliographical references (p. 165-169)
Field of study: Civil engineering
System Created
- 2015-02-01 07:01:25
System Modified
- 2021-08-30 01:31:39
- 3 years 2 months ago
Additional Formats