Description
The following report followed three separate construction crews at a construction site at ASU and performed labor productivity analysis to quantitatively measure the efficiency of the workers performing specific tasks. These crews were tasked with electrical wiring, concrete pouring, and drywall sanding. Crew balance measured the down time of individual crew members compared to the overall time spent on a task, and the results of these observations were calculated, and suggested improvements given.
Details
Title
- Crew Balance in Construction Tasks for Productivity Analysis - A Sustainability Perspective
Contributors
- Scollick, Evelyn (Author)
- Grau, David (Thesis director)
- Lamanna, Anthony (Committee member)
- School of Film, Dance and Theatre (Contributor)
- Mechanical and Aerospace Engineering Program (Contributor)
- Barrett, The Honors College (Contributor)
Date Created
The date the item was original created (prior to any relationship with the ASU Digital Repositories.)
2020-05
Resource Type
Collections this item is in