Research has shown that construction projects in Saudi Arabia have exhibited poor performance for the past three decades. The traditional risk management practices have been ineffective at helping contractors deliver projects on time and within budget while meeting quality expectations. Studies have identified that client decision making is one of the main causes of risks that occur on projects in Saudi Arabia. This paper proposes a new risk management model that can minimize client decision making, and enable the client to utilize expertise, thereby improving project quality and performance. The model is derived from the Information Measurement Theory (IMT) and Performance Information Procurement System (PIPS), both developed at Arizona State University in the United States (U.S.). The model has been tested over 1800 times in both construction and non-construction projects, showing a decrease in required management by owner by up to 80% and an increase in efficiency up to 40%.
Details
- Introducing a New Risk Management Model to the Saudi Arabian Construction Industry
- Algahtany, Mohammed (Author)
- Alhammadi, Yasir (Author)
- Kashiwagi, Dean (Author)
- Ira A. Fulton School of Engineering (Contributor)
- Digital object identifier: 10.1016/j.proeng.2016.04.122
- Identifier TypeInternational standard serial numberIdentifier Value1877-7058
Citation and reuse
Cite this item
This is a suggested citation. Consult the appropriate style guide for specific citation guidelines.
Algahtany, M., Alhammadi, Y., & Kashiwagi, D. (2016). Introducing a New Risk Management Model to the Saudi Arabian Construction Industry. Procedia Engineering, 145, 940-947. doi:10.1016/j.proeng.2016.04.122